Project Background

Battery insulators, taped to the millimetre.

Rimac needed one line to apply double-sided tape and a protective film to the mica insulation sheets of its CCS battery modules, for both the Top and the Bottom parts.

A small part with no room for error.

Mica insulation sheets protect the cells of an electric-vehicle battery module. Each sheet has to carry its tape and its protective film exactly where the drawing says, clean, free of static, and with no reject ever reaching the next process.

The brief for XYJC:

  • Top and Bottom parts on the same line
  • Tape within ±1 mm, protective film within ±0.5 mm
  • Clean, static-free surfaces before taping
  • Every carrier and every part traced, every reject locked away
XYJC automation equipment being crated for export in the Suzhou workshop

Project at a glance

Customer
Rimac · Bane Sedam CCS programme
Industry
Battery manufacturing · new energy vehicles
Product
CCS battery mica insulation sheets, Top and Bottom
Scope
Semi-automatic taping and protective film line, custom built
Location
Czech Republic
Lead time
83 days from design to shipment
Our Solution

Six steps on one line. A camera on every part.

A 15-metre semi-automatic line: camera-guided gantry handling, four taping units, four-camera inspection and automatic film application, all on RFID-tracked carriers.

Pick-and-place modules and cabling inside an XYJC automation station
  1. 01

    Non-stop loading

    Mica trays are loaded on alternating seats, so the line never stops for material. A camera-guided gantry picks two parts at a time.

  2. 02

    Cleaning

    Parts and trays are cleaned by combined blowing and suction, with ionisation against static and vacuum dust extraction. Air flow is monitored.

  3. 03

    Taping

    Four 4-axis taping units peel, cut and apply the double-sided tape within ±1 mm: ≤2.5 s per tape on Bottom parts, ≤2.8 s on Top parts. A reel change takes less than 2.5 minutes.

  4. 04

    Inspection

    Four Keyence cameras check the position and presence of every tape at the same time.

  5. 05

    Protective film

    A gantry applies and cuts the protective film automatically within ±0.5 mm. A quick-change structure keeps a material change to about 5 minutes.

  6. 06

    Sorting & traceability

    Good parts go back into trays. Rejects are stamped and dropped into a locked NG box that opens only with a badge. Each carrier has an RFID chip, and each part is bound to it by barcode scan.

Technical Data

Line specifications.

The main parameters of the Rimac mica insulation taping and film line, as designed and built by XYJC.

Line type
Semi-automatic mica insulation taping and protective film line (custom built)
Products
Rimac Bane Sedam CCS mica insulation sheets, Top and Bottom
Cycle time
Top 15 s/pc (30 s per 2 pcs) · Bottom 35 s/pc (70 s per 2 pcs)
OEE
≥85 %
Operators
3, including material replenishment
Line layout
Mica loading · cleaning · 4 taping units · camera inspection · film application · OK / NG unloading · material table
Taping
4-axis robots, automatic peel / cut / apply, ±1 mm · reel change <2.5 min
Protective film
Gantry application and automatic cutting, ±0.5 mm · film 0.025 ± 0.005 mm · material change about 5 min
Vision
4 cameras checking tape position and presence (Keyence)
Cleaning
Blow-suction cleaning, ionisation and vacuum dust extraction, air flow monitoring
Traceability
Chip in every carrier with RFID read / write (IFM), barcode binding of each part
Conveyor
Carriers 1300 × 800 mm · 8–12 m/min variable speed · 500 kg/m · lift positioning ±0.1 mm
Reject control
Rejects stamped and dropped into a locked NG box, badge access only
Footprint
15,000 × 3,500 × 2,300 mm
Main components
SIEMENS PLC / HMI · SMC pneumatics · TOYO linear modules · HIWIN guides · Keyence CCD and 3D line laser · IFM RFID · ZEBRA label printer
Lead time
83 days to shipment: design 29 · machining and purchasing 20 · assembly 10 · debugging 18 · pre-acceptance 4
Results

On rate, on spec. Shipped in 83 days.

Both insulator types run on one line with three operators, and every part leaves with its inspection result and its traceability record.

  • 15sCycle time per Top part (35 s per Bottom part)
  • ≥85%OEE
  • 3Operators, including material replenishment
  • ±0.5mmFilm accuracy (tape ±1 mm)
  • 83daysFrom design to shipment
More Case Studies

More lines running at rate.

Start a project

Bring us your part.
We'll design the line.

Send a drawing, a sample or your target cycle time. Our engineers come back with a line concept and a feasibility review.

Watch a line run
XYJC engineers working on an automation station