One team, from concept to a line at rate.
Customers do not buy a machine. They buy a line that holds yield and output. The engineers who design your line are the ones who build it, commission it and support it.
-
01Project assessment & solution design
We design backwards from your cycle time, yield and OEE. Send a drawing, a sample or your target cycle time: our engineers review feasibility and come back with a line concept. Sample first, deliver second.
- Part, drawing and process review
- Line concept with cycle time, OEE and operator targets
- Sampling and process validation before the build
-
02Installation & commissioning
Every machine is assembled, debugged and capacity-verified in our plant before it ships. On site, our engineers install and commission the line, and we stay until it runs at rate.
- Factory acceptance test (FAT) in Suzhou before shipment
- On-site installation, commissioning and site acceptance (SAT)
- Run-in until the line holds cycle time and yield
-
03Training & after-sales support
Your operators and maintenance technicians learn the line on the line, during commissioning. After acceptance, the engineers who built it remain your point of contact.
- Operator training at the stations
- Maintenance and changeover training for your technicians
- Documentation and a named service contact
Proven in Suzhou. Accepted on your floor.
Every line follows the same four steps, with clear acceptance points. Below, the real lead times of three recent projects.
- Assessment & designFeasibility, line concept, sampling
- Build in SuzhouPurchasing, machining, assembly
- Debugging & FATCapacity check before shipment
- Installation & SATCommissioning at your plant
-
Pin insertion & bending
GEN2 23P / 29P
80daysto pre-acceptance -
Battery CCS insulation
Mica taping & filming
83daysto shipment -
Connector assembly
UP8 130-way line
30wk+ 90 days on site
Acceptance criteria BOSCH 124P connector line
- Pre-acceptance
- 12 h continuous run
- Final acceptance
- 36 h continuous run
- Downtime
- < 0.5 h
- Cycle time
- 6.8 s
- Defect rate
- < 1.5 %
Built in Suzhou. Supported where you produce.
Headquartered in Suzhou, with local support in Mexico and Hungary. In 2026, our first CCS turnkey line goes live in the Czech Republic.
-
Headquarters & plant
Suzhou
Jiangsu, China
31.30° N · 120.74° E -
Local support
Hermosillo
Sonora, Mexico
29.07° N · 110.96° W -
Local support
Budapest
Hungary
47.50° N · 19.04° E -
CCS turnkey line · 2026
Czech Republic
European battery supply chain
Going live in 2026
Keep the line running. Year after year.
Spare parts, remote diagnostics and maintenance contracts, agreed with you for each project.
-
Spare parts supply
A recommended spare parts list comes with every line. Wear parts such as insertion grippers and bending heads are made and shipped from Suzhou.
-
Remote diagnostics
With your approval, our engineers connect to the line to read alarms, check data and adjust parameters, often without waiting for a site visit.
-
Maintenance contracts
Preventive maintenance visits, inspections and response times written into a contract that fits your plant and your shifts.
Services are subject to the scope agreed for each project.
Bring us your part.
We'll design the line.
Send a drawing, a sample or your target cycle time. Our engineers come back with a line concept and a feasibility review.